CONSTRUCTION ERP · AI-NATIVE

Construction management software, with an AI team.

AI assists with records, planning and repetitive work within its delegated scope. Teams share the same project records.

L1L2L3L4L5
WO-018 · Level 5Rebar: 8 / 12 t
Illustrative construction model

AI team / Riverside

Illustrative example · availability follows enabled permissions

  1. Internal document createdWithin the delegated scope
    Done
  2. PR-043 · Draft requisitionAutomatic execution: requires enablement
    Draft for review
  3. Letter to supplier NCC-07Automatic execution: requires enablement
    Draft for review
  4. Task schedule adjustmentAutomatic execution: requires enablement
    Draft for review
Payment approvalAn authorised person decides

Automatic execution requires a released action, valid delegation and applicable limits.

12 modulesAI colleagues by roleOne set of project recordsVI · EN / Web · mobile

The problem

When each department keeps its own records

Problems surface late, when they are harder to fix. The result is rework, late handovers and late progress claims.

Project recordsRIVERSIDE PlanningWBS 02.03AccountsINV-031ProcurementPO-024QSIPC-006SiteWO-018
Five departments, one linked set of project records.
  1. Schedules out of date

    Plans do not reflect constraints on drawings, materials, site access or labour.

    In ACMSA work order is released only when drawings, materials, crew and inspections are confirmed.
  2. Costs seen too late

    Purchase orders are placed and subcontract work goes ahead before reports show the full position.

    In ACMSBudgets are checked before purchase; commitments show as soon as an order is approved.
  3. Documents out of step

    Designs change while site teams keep working from earlier revisions.

    In ACMSOnly the approved revision reaches site, and work orders using the old one are listed.
  4. Claims prepared late

    Quantities, inspection records and variations have to be collected from several people.

    In ACMSOnly accepted quantities enter the claim, and missing documents show before submission.

Example

Work order WO-018: Level 5 slab pour

Illustrative data. What the site supervisor, project manager and accountant see in ACMS when a rebar delivery arrives short.

  1. Step 1 · Site supervisor

    ACMS holds the work order until all 11 conditions are met

    Before a work order is released, ACMS checks drawings, crew, equipment, safety, materials and inspections. WO-018 meets 9 of them: rebar Ø16 arrived 8 of 12 t and the formwork is not yet inspected, so the order stays on hold.

    • Each condition opens the record behind it
    • Planning, procurement and site see the same list
    WO-018 · Level 5 slab pourIllustrative
    9/11

    Release conditions

    2 conditions open

    WO-018 stays on hold until all 11 are met.

    • Drawings Rev C issued
    • Formwork crew · 14 people
    • Concrete pump booked
    • Pour method statement
    • Safety permit
    • Concrete mix approved
    • MEP sleeves placed
    • Survey levels checked
    • Weather window
    • Rebar Ø16 · 8 of 12 t
    • Formwork inspection

    Release held WO-018 cannot be released until the rebar and the formwork inspection are confirmed.

  2. Step 2 · Project manager

    Finding the cause with the AI assistant

    The project manager asks the assistant why the order is held. The answer cites purchase order PO-024, delivery note DN-311 and task WBS 02.03. The assistant can draft a proposal, but it only takes effect after QS approves it.

    • The assistant reads only what the person asking may see
    • Proposals wait for an authorised approver
    WO-018 · Level 5 slab pourIllustrative

    Why is WO-018 on hold?

    PO-024 is 7 days late: 4 t of Ø16 rebar not yet delivered 1. The Level 5 pour depends on it 2, so the release is held.

    Records cited

    1. Work orderWO-018Held
    2. Level 5 slabWBS 02.03Due 19 Nov
    3. Purchase orderPO-0247 days late
    4. Delivery noteDN-3118/12 t
    Draft: order the remaining 4 t from a second supplierPour possible on 20 Nov · extra cost 80 m VND
    Awaiting QS approval

    The assistant reads only the records the person asking is allowed to see.

  3. Step 3 · Project manager and accountant

    Updating the schedule and cash forecast

    The forecast completion of Level 5 moves from 19 to 24 November. The 1.2 bn payment linked to the pour moves from November to December. The approved baseline is kept for comparison.

    • Baseline and forecast are stored separately
    • Accounting sees the change by month
    WO-018 · Level 5 slab pourIllustrative
    Level 5 complete19/11 → 24/11+5 days
    Cash out, November4.6 → 3.4 bn1.2 bn moves to Dec
    Remaining work · November 2026
    09–15/1116–22/1123–29/11FormworkRebarMEP checksInspection24/11
    1. WBS 02.03Work
    2. WO-018Execution
    3. QA-018Inspection
    4. IPC-006Claim

    Illustrative sequence after resolving release conditions; not an approved reschedule.

WO-018 · Level 5 slab pourIllustrative
9/11

Release conditions

2 conditions open

WO-018 stays on hold until all 11 are met.

  • Drawings Rev C issued
  • Formwork crew · 14 people
  • Concrete pump booked
  • Pour method statement
  • Safety permit
  • Concrete mix approved
  • MEP sleeves placed
  • Survey levels checked
  • Weather window
  • Rebar Ø16 · 8 of 12 t
  • Formwork inspection

Release held WO-018 cannot be released until the rebar and the formwork inspection are confirmed.

Why is WO-018 on hold?

PO-024 is 7 days late: 4 t of Ø16 rebar not yet delivered 1. The Level 5 pour depends on it 2, so the release is held.

Records cited

  1. Work orderWO-018Held
  2. Level 5 slabWBS 02.03Due 19 Nov
  3. Purchase orderPO-0247 days late
  4. Delivery noteDN-3118/12 t
Draft: order the remaining 4 t from a second supplierPour possible on 20 Nov · extra cost 80 m VND
Awaiting QS approval

The assistant reads only the records the person asking is allowed to see.

Level 5 complete19/11 → 24/11+5 days
Cash out, November4.6 → 3.4 bn1.2 bn moves to Dec
Remaining work · November 2026
09–15/1116–22/1123–29/11FormworkRebarMEP checksInspection24/11
  1. WBS 02.03Work
  2. WO-018Execution
  3. QA-018Inspection
  4. IPC-006Claim

Illustrative sequence after resolving release conditions; not an approved reschedule.

WORK BY ROLE

Your AI team

Explore five role-based examples. Automatic execution depends on released actions and delegated permissions.

Automatic execution: only enabled actions within delegated permissions.
Draft for review

Procurement colleague / PR-043

Draft a requisition for the missing 4 t of rebar. Sending a supplier letter also requires outbound permission and an enabled action.

People decideRequisition and purchase-order approval
Example source recordsPR-043WO-018AI capabilities →

Core modules

Documents, supply and people on site

Three common causes of delay on site: work done to an old drawing, material that arrives at the wrong time, and a crew without the skills the task needs. These three modules focus on them.

eDocsDocument control

Site works from the issued revision

Crews build from the drawing in their hands. ACMS keeps each document’s revisions, approvals and recipients, and lists the work orders still pointing at a superseded revision.

  • Revisions with status: draft, for approval, issued, superseded
  • Approval workflow and transmittals to consultants, with receipt confirmed
  • Drawings linked to work orders; orders on an old revision are listed
  • Search by number, title and the text inside scans (Vietnamese and English)
Module details
STR-024 · Rev CLevel 5 slab
STR-024 · Rev C
1234ABC18 0006 0006 0006 0005 0005 000S1 · h=150+16.500Ø10a200S4 · h=150+16.500Ø10a200S2 · h=150+16.500Ø10a200S5 · h=150+16.500Ø10a200S3 · h=150+16.500Ø10a200B1 (250×500)B4 (250×550)B2 (250×500)B5 (250×550)B3 (250×500)B6 (250×550)STAIR COREOPENING600×60011LEVEL 5 · SLAB & BEAM LAYOUTIllustrative scale 1:100 · dimensions in mmSECTION 1–1B4 · 250×5502Ø20 + 3Ø20Ø8a150GENERAL NOTES01 All dimensions in millimetres.02 Levels shown in metres.03 Coordinate openings with MEP.04 Refer to column schedules.05 Illustrative geometry only.BEAM DETAIL B42505502Ø20 / 3Ø20 · Ø8a150REVISION REGISTERC 05.11.26 CoordinationB 28.10.26 ReviewACMS / RIVERSIDELEVEL 5 STRUCTURAL PLANSTR-024Rev CILLUSTRATIVE · NOT FOR CONSTRUCTIONSheet 01 / 01 · 05 NOV 20261:100A1
Rev C · IssuedRev B · Superseded

WO-018 → STR-024 Rev C
WO-021 → Rev B · Update before release

SCMSupply chain

Deliveries follow the site programme

Material should arrive when the work front is ready: early ties up space and cash, late leaves the crew waiting. When the site runs ahead of or behind plan, the need-by date moves with it and supply partners receive the new date.

  • Delivery schedules split into tranches per order line
  • Suppliers post shipping notices and ETAs through their portal
  • When the schedule changes, supply partners receive the new need-by date
  • An expediting board: overdue, notice late, due soon, on track
Module details

HCMPeople & skills

Weekly crews chosen by skill and level

HCM tracks each worker’s development, trade skills and level. Schedulers use that record to choose people and place them on shifts in the weekly plan.

  • Trade skills with level and validity, certificates with expiry
  • Development path from apprentice to lead, reviewed over time
  • The weekly plan picks people by required skill and level
  • Attendance and payroll follow the assignment, project by project
Module details

ERP

One system and one database for the whole company

Modules share projects, WBS, people, partners and documents. A document is created once and moves on through the departments, updating budget, stock and cash on the way.

Riverside · Cash disbursementsCumulative · bn VND
Cost budget · bn VND38.0
Committed · bn VND28.6
Paid to date · bn VND13.4
Approved baselineRevised forecast
05101520Nov: −1.2 bnOct / 26Nov / 26Dec / 26Jan / 27

WO-018: 1.2 bn shifts from November to December. This changes timing, not total payment.

Cost control · 30 Nov 2026 · illustrative
ScopeBudgetCommittedPaid
Structure26.019.08.0
MEP8.06.44.0
Other works4.03.21.4
Total38.028.613.4

bn VND · Budget, commitments and paid amounts are separate states; do not add the columns. Sample cost budget is separate from the 42 bn contract value below.

One delivery, five departments

  1. PR-042Material request · Site
    Approved

    → WBS 02.03 demand recorded

  2. PO-024Purchase order · Procurement
    Approved

    → Commitment 1.2 bn against the budget

  3. GR-016Goods receipt · Stores
    8 / 12 t

    → Stock on site and WO-018 conditions updated

  4. INV-031Supplier invoice · Accounting
    Matched to PO and receipt

    → Payable recorded for 8 t only

  5. PAY-077Payment · Finance
    Awaiting approval

    → Cash forecast for November updated

Consolidated view · Novemberbn VND · illustrative
ProjectEntityContractForecast costMargin %Cash, Nov
RiversideEntity A · VN42,039,26,7−1,4
Bac An FactoryEntity A · VN25,522,810,6+0,6
East Link RoadEntity B · AU35,031,69,7−0,8
Total2 entities102,593,68,7−1,6

AI-native

AI inside every module, not a chat box on the side

Each module declares what it can do once. The assistant, background tasks and outside apps all use those capabilities, within the user’s permissions; execution depends on enabled actions and delegated permissions.

Modules declare capabilities

  • Procurement
  • Work orders
  • Quality
  • Planning
  • Payables
  • HR
  • Safety
  • Documents
Capabilities

Used by

  • Assistant on screenAnswers with sources, opens the right screen, fills in forms for review.
  • Background tasksMorning briefs and recurring checks that leave cards in your inbox.
  • Outside apps via MCPOther AI tools call the same capabilities, with the same permissions.
Approval inbox

Changes wait here for a person with authority.

40+
action types, each with its own execution policy
OCR
reads Vietnamese and English documents and photos
MCP
open protocol for outside AI tools
0
payment approvals or payments delegated to AI
Input

Photos and notes at the end of a shift

Site · Output

Site diary draft for 5 Nov: 98 people, 7 crews, rebar 4 t short

Draft

Built for construction

For the site as much as for the office

ACMS works with the records construction teams already use, on residential, industrial and infrastructure projects.

RESIDENTIAL / LEVEL 05

Residential & commercial

Progress by floor and zone, formwork and pour cycles, MEP rough-in, handover by apartment.

INDUSTRIAL / STEEL FRAME

Industrial

Steel structure and roofing, equipment deliveries, commissioning records.

INFRASTRUCTURE / BRIDGE

Infrastructure

Quantities by chainage, plant hours, earthworks and drainage inspections.

ACMS / RiversideDRAWINGS & INSPECTIONS
1234ABC18 0006 0006 0006 0005 0005 000S1 · h=150+16.500Ø10a200S4 · h=150+16.500Ø10a200S2 · h=150+16.500Ø10a200S5 · h=150+16.500Ø10a200S3 · h=150+16.500Ø10a200B1 (250×500)B4 (250×550)B2 (250×500)B5 (250×550)B3 (250×500)B6 (250×550)STAIR COREOPENING600×60011LEVEL 5 · SLAB & BEAM LAYOUTIllustrative scale 1:100 · dimensions in mmSECTION 1–1B4 · 250×5502Ø20 + 3Ø20Ø8a150GENERAL NOTES01 All dimensions in millimetres.02 Levels shown in metres.03 Coordinate openings with MEP.04 Refer to column schedules.05 Illustrative geometry only.BEAM DETAIL B42505502Ø20 / 3Ø20 · Ø8a150REVISION REGISTERC 05.11.26 CoordinationB 28.10.26 ReviewACMS / RIVERSIDELEVEL 5 STRUCTURAL PLANSTR-024Rev CILLUSTRATIVE · NOT FOR CONSTRUCTIONSheet 01 / 01 · 05 NOV 20261:100A1

On site, on phone and tablet

Roll call, site diary with photos, work-order checklists and material requests go straight into the same records the office uses, limited to the projects each person is assigned.

Construction records ACMS manages

  • BOQ
  • WBS
  • Work order
  • Site diary
  • Inspection
  • NCR
  • Variation
  • IPC
  • Drawing revision
  • Timesheet

Modules

Twelve modules in four groups

Every department works on the same project list, WBS, people and documents. A delivery recorded in procurement is visible to planning, site and finance without re-entry.

Module details and examples

By role

What each role does in ACMS

Choose a role to see its daily tasks, the records it works on and who receives the handover.

Business owner

Review the projects that need a decision

  • Compare project forecasts with approved budgets
  • Review receipts and payments with opening cash
  • Approve within the organisation’s authority rules
Records used
Forecast F02Budget B03Cash plan
Hands over to
Finance confirms the assumptions; project managers explain the changes.

All roles and handovers

DELEGATION CONTROLS

Delegate work to AI

Choose how each type of work is handled within the permissions you grant.

AI prepares a proposal for you to review. The example below does not grant access or execute work.

Project
Riverside
Amount limit
Per action & currency
Actions per day
Organisation limits
Delegation period
Valid until expiry or revocation

Automatic pause after repeated errors

An attributable activity log

Who delegated the work, what AI did, when, and which record changed.

Undo depends on the action

  • Drafts: while reversal conditions still hold
  • Supplier letters: cancel during the 10-minute send delay
  • Other actions may not support undo

Payment approval and payment remain with authorised people.

Role-based access · Project scope · Change historyData & access →

Pricing

A plan fee plus the people who use it

Indicative list prices in USD, excluding tax. Yearly billing shown per month.

Indicative prices, effective from 1 Dec 2026.

  • Starter$55.25/ month3 office users included
  • Growth$169.15/ month10 office users included
  • Enterprise$509.15/ month25 office users included

Questions

Before you book a demo

Other questions: contact@acmsystem.net

Can we start with one project or one workflow?

Yes. A rollout starts with a pilot project and the workflows with the most impact on schedule, cost or payment, then extends once the agreed scope is accepted.

We keep everything in Excel today. How is it moved?

Representative files are reviewed, columns and codes are mapped, then data is test-loaded and reconciled before cut-over.

Does it work on site, on a phone?

Yes. Site teams use the same records on mobile devices, limited to the projects and tasks they are assigned.

We have several companies and currencies.

Entities, currencies and approval rules are configured per company within one system, in Vietnamese and English.

Can the AI approve or pay on its own?

Payment approval and payment remain with authorised people. Other work can execute automatically only when its action type is enabled, delegated and within applicable limits. Undo depends on the action.

How is it priced?

A plan fee plus the people who use it, in USD. Indicative prices are on the Pricing page.

Book a demo with your own project data

Send us a sample schedule, work order or payment file. The demo walks through that process in ACMS with your team.